דלג לתוכן הראשי
--:--:--
All case studies
Forensic engineering / expert witness
United Kingdom

Winning a $2.4M subrogation case with a court-ready expert opinion documentation

Client: Forensic engineering practice (anonymized)

Challenge

A $2.4M industrial fire subrogation depended on defensibly attributing cause to a specific piece of equipment. The engineer's initial opinion was technically sound but format-vulnerable — mixed exhibits, unclear methodology disclosure, and no chain-of-custody on photos. Opposing counsel indicated they would move to exclude.

Solution

Migrated the opinion into GARAASSETS's Court-Ready module. Re-organized 187 exhibits with hashes and timestamps, produced a methodology appendix citing NFPA 921 and BS 7974, enforced chain-of-custody for every photo. Delivered as a signed PDF/A-3 package with embedded exhibits.

Results
  • Motion to exclude: withdrawn after opinion re-submission
  • Case settled at 92% of claim value (industry median: 68%)
  • Expert cross-examination time: 4 hours (vs 2-day estimate)
  • Practice now uses Court-Ready template for every opinion above $500K exposure

Every exhibit ID matched, every photo had provenance, every claim was traceable to the standard. The methodology appendix ended the argument before it started.

Principal Engineer, Forensic engineering practice