דלג לתוכן הראשי
--:--:--
All case studies
Forensic engineering / expert witness
United Kingdom

Winning a $2.4M subrogation case with a court-ready expert opinion documentation

Client: Forensic engineering practice (anonymized)

Challenge

A $2.4M industrial fire subrogation depended on defensibly attributing cause to a specific piece of equipment. The engineer's initial opinion was technically sound but format-vulnerable — mixed exhibits, unclear methodology disclosure, and no chain-of-custody on photos. Opposing counsel indicated they would move to exclude.

Solution

Migrated the opinion into GARAASSETS's Court-Ready module. Re-organized 187 exhibits with hashes and timestamps, produced a methodology appendix citing NFPA 921 and BS 7974, enforced chain-of-custody for every photo. Delivered as a signed PDF/A-3 package with embedded exhibits.

Results
  • Motion to exclude: withdrawn after opinion re-submission
  • Case settled at 92% of claim value (industry median: 68%)
  • Expert cross-examination time: 4 hours (vs 2-day estimate)
  • Practice now uses Court-Ready template for every opinion above $500K exposure

“Every exhibit ID matched, every photo had provenance, every claim was traceable to the standard. The methodology appendix ended the argument before it started.”

— Principal Engineer, Forensic engineering practice

Want results like these?