01 / How it works
Every number is traceable
The suite supports decisions — it does not replace engineers, utilities or investment committees.
- 1
Create region
Define the region, target MW and decision horizon for the tenant.
- 2
Ingest sites
Import candidate sites with stable IDs and provenance.
- 3
Attach power / land / fiber / permits
Attach power nodes, parcels, fiber routes and permits — each with freshness.
- 4
Rank sites
Apply No-Go / hard / soft rules, then weighted multi-criteria ranking.
- 5
Run scenario
Model power path, phasing, capex and schedule for a site.
- 6
Compare
Compare 2–5 build paths with locked assumptions.
- 7
Investment gate
Go / Hold / Kill / Accelerate — requires a named human approver.
- 8
Portfolio view
Roll decisions up into capital allocation and MW delivery.
02 / Explainability
How a site score decomposes
Example: synthetic site S-101. Weights are tenant-configurable and every change is audited.
| S-101 | Weight | Factor score | Contribution |
|---|---|---|---|
| Power | 30% | 88 | 26.4 |
| Land | 15% | 82 | 12.3 |
| Fiber | 15% | 79 | 11.8 |
| Water / cooling | 10% | 74 | 7.4 |
| Permits | 20% | 86 | 17.2 |
| Climate | 10% | 90 | 9.0 |
| Σ | 84.2 | ||